- May 20, 2015
-
- Setting our two 90 ton cranes up right inside the railroad tracks. The work was coordinated to be done in the middle of the night because the line was active during the day. This type of planning and coordination is paramount in getting a job done safely and in a timely manner for the customer. This type of work in common place for us at Mullins.
-
- A dangerous job location like this takes careful planning by an experienced crane company. At Mullins Rigging you can rest assure that your job will get done in the safest most timely manner. Setting up where trains go flying by at 125 mph need to be well planned. There can be no mistakes in the planning of a job like this. The type of logistical planning needed to have a job like this done safely is matched by no one.
-
- We used flood lights to light the way through the night. The work hours were from about 9PM til about 3 AM.