- July 01, 2015
-
- Another unique job done by Mullins Rigging. The home owner wanted a second story to their home. The builder wanted to keep the roof intact. So what do you do. Call us up and have us pick the roof off of the building. We lift the roof off by sliding two large beams through the builiding and picking from these points. Once the roof was off the builder builds the second floor and then we return to set the roof back on top. We make the impossible possible at Mullins Rigging.
-
- Notice this is right before we pick the roof. Now watch in the pictures ahead as the 2nd floor is added.
-
- Phone lines and other electrical lines were everywhere. Their was only one place to set up because the crane was surrounded. It’s safe to say a crane was never suppose to be on that street but we made it possible. We’ve been around the longest and do things the other companies can not. This is one of those jobs where every detail needs to be well thought out ahead of time.
-
- You can tell from this picture that the 2nd floor has been added. Now we need to remove the beams from the building.
-
- Using chainfalls we slide the beams out the far end of the building because there was no room to bring them in the other way.
- Crane Services