- November 04, 2013
-
- The scaffold had to be set up because we were working on two small A/C units on the side of a cell building on the rooftop. It was so close to the end of the building there was no room to work on the unit so the scaffold was built for a working platform.
-
- The building had multiple roof lines. The scaffold is built on top of the rooftop below. The scaffold stands about 20 feet.
-
- Crane from the roof. The lower roof and the upper peaked roof were the biggest obstacles. On the high roof there were cell phone antennas sticking up about an extra 10 ft. in the air.
- Crane Services