- September 11, 2014
-
- The roadway going into the bridge. Was filled from one end to the other will all the trailers required to set the crane up.
-
- The roadway going into the bridge. Was filled from one end to the other will all the trailers required to set the crane up.
-
- The first truss is tied off and held while the other one is picked. When they are both in place the 90 ton crane reached out and sets the floor beams making it safe to disconnect the 600 ton crane.
-
- Bridge finally done and ceremonial first vehicle driven over it. Great job done by a great group of guys.
- Crane Services